Stars Change Order Line Half 3D Warm Plush Fleece Blanket Picnic Sofa Couch

$54.98

  • Total: $0.00
- OR -
Guaranteed Safe Checkout
100% Secure payment with SSL Encryption. Full Refund if you don't receive your order.

Stars Change Order Line Half 3D Warm Plush Fleece Blanket Picnic Sofa Couch

​Product Information:

  • All of our Blankets are handcrafted to the highest quality standards. Each blanket features a premium suede polyester print for beautiful color vibrancy.
  • Luxurious, silky, and cozy, to keep you warm and comfortable.
  • 100% Polyester: This extremely strong and durable synthetic fabric retains its shape and dries quickly
  • Full color all over print; Prints edge to edge on one side via Sublimation print technique
  • Hemmed edges: Sewn following Z-lines stitches all around for a beautiful look and making it durable and long-lasting
  • Machine wash separately in cold water; Tumble dry on low heat
  • Do not iron or press with heat; Do not dry clean
  • Makes A Perfect Gift: Perfect gift for moms, dads, wives, husbands, sisters, brothers, cousins, friends & students on Mother’s Day, Father’s day, Xmas, Easter, Valentines Day, and Birthday gift.
  • Blanket’s base color: White.
  • Production Dimensions: 60*80 inches, thickness 0.6 cm

Size Guide: